Engaged on TRS sheds involved in overhauling and assembly level servicing of 25KV AC electric powered locos in electrical loco sheds is the worker’s responsibility. Candidates planning for numerous other RRB tests can Verify the next links for thorough planning and revision- Many stations of Kolkata Metro system don't have https://railway-group-d-jobs26701.ja-blog.com/32318608/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf